What to request from the owner
A lot plan, land area, title/tenure information, intended selling price, access road details, availability of power and water, current use and whether there are caveats, charges or other restrictions.
Land price is not the total cost
Allow for land conversion or conditions, infrastructure, earthwork, utility connections, planning and approval costs where relevant. A large vacant parcel is not automatically ready for factory construction.
For investors and companies
If you are sourcing a single industrial lot or multiple sites, define minimum acreage, preferred industrial corridors, acceptable title status and the timeframe for due diligence.
How to enquire
What do you need? Send me your preferred area, property type, budget, size and timeline. For factory, also mention power supply and operation.